Thanks Chris!
Mother Nature decided to flip the extreme weather (at least for my area). Got super cold & snowed a couple inches. The cold made the PL set extremely slow and I didn't have a portable heater to warm up the garage. Progress was slow today, but in the end, I got the mouth braces in and both side panels for both speakers on. Praying to the speaker gods that there are no leaks.
Like last time, things weren't square with the side panel (not sure how everyone does it other than constantly building and not waiting years between builds), so there will be some shaving, sanding, and fudging going on. Supposed to use them tomorrow night for a private gig, but we'll see what happens in the morning. Flanges, access panels, mount the jacks & drivers, leak test, route the edges, and paint are about all that's left. Might just throw the flat black paint on and call it good for the party. No one there will care except me.

- IMG_2052.jpg (10.8 KiB) Viewed 2153 times

- Here's the second one the the side panel on resting on top of the first.
- IMG_2053.jpg (12.22 KiB) Viewed 2153 times