Page 2 of 2
Re: Finally...OFFICIALLY underway
Posted: Wed Jul 04, 2018 6:38 pm
by himhimself
Cut some strips of 3/8 Baltic 1.75 inches wide and glued them around the mouth, with the inside edge rostered over. Looks a little beefier now to match how they sound

Wheels on the back bottom edge, black plastic corners all around. Another coat of duratex on them both. V-plate tee nuts in and sandwiched between the sides and new strips. V-plate is duratexed and has the larger tee nuts in as bushings. Should be all ready for the block party on Saturday now.
Re: Finally...OFFICIALLY underway
Posted: Wed Jul 04, 2018 8:11 pm
by CoronaOperator
That looks really good!

You are going to wish you put handles on that though.
Re: Finally...OFFICIALLY underway
Posted: Thu Jul 05, 2018 7:00 am
by ketoet
+1
Re: Finally...OFFICIALLY underway
Posted: Thu Jul 05, 2018 7:12 am
by himhimself
Yep, already kicking myself for not cutting the front handles in. It's on the list to be done soon.
Re: Finally...OFFICIALLY underway
Posted: Sat Feb 15, 2020 2:49 pm
by himhimself
Finally took the took the time to open my t30s back up and connect all 4 speakons. Used a couple hanger bolts with wing nuts to connect the leads along with another short lead going to the driver. Now I can mix and match between between any of the cabinet inputs depending upon how and where I set them up. Should of done this ages ago. Oh well, better late than never.