It doesn't take long for the build-up...
-
- Posts: 176
- Joined: Wed Nov 03, 2010 5:15 am
- Location: Lincs UK
Re: It doesn't take long for the build-up...
In England put it out side with a sign FREE FIREWOOD would be gone in two seconds inculding the trailer!
built 4 T30 24in BP102 now sold 2 DR280
2 speakerplans 1850, 2 MT102 ,2 X15, 1 G sub now sold
2 T60,s Built plus 4 DR280,s in the build
2 speakerplans 1850, 2 MT102 ,2 X15, 1 G sub now sold
2 T60,s Built plus 4 DR280,s in the build
- Harley
- Posts: 5758
- Joined: Mon May 08, 2006 2:45 pm
- Location: Christchurch, New Zealand - Authorised BFM Cab Builder
Re: It doesn't take long for the build-up...
Yep...we have those immigrants too...except here they're savvy enough to know that ply does not burn well so the bastards would dump the ply on your lawn and steal the trailer.lincsoldbird wrote:In England put it out side with a sign FREE FIREWOOD would be gone in two seconds inculding the trailer!
-
- Posts: 176
- Joined: Wed Nov 03, 2010 5:15 am
- Location: Lincs UK
Re: It doesn't take long for the build-up...
Yes but they love chipboard.
built 4 T30 24in BP102 now sold 2 DR280
2 speakerplans 1850, 2 MT102 ,2 X15, 1 G sub now sold
2 T60,s Built plus 4 DR280,s in the build
2 speakerplans 1850, 2 MT102 ,2 X15, 1 G sub now sold
2 T60,s Built plus 4 DR280,s in the build
-
- Posts: 258
- Joined: Tue Sep 15, 2009 10:03 am
- Location: South Australia
Re: It doesn't take long for the build-up...
take the wood to you local kindergarten, they like giving the kids random bits of wood to nail random things to. then they have to dump it.
- Harley
- Posts: 5758
- Joined: Mon May 08, 2006 2:45 pm
- Location: Christchurch, New Zealand - Authorised BFM Cab Builder
Re: It doesn't take long for the build-up...
Too late, we've had rain ( don't we always ?CafSentryGnome wrote:take the wood to you local kindergarten, they like giving the kids random bits of wood to nail random things to. then they have to dump it.

I'm dumping it a sackful at a time at work.