Page 1 of 1

At it again,4 more T-48's

Posted: Sat Mar 26, 2016 2:40 am
by djtrumptight
So,I have decided to get started on building 4 more T 48's,24" wide.As I was reading over the plans I notice we were told early on in the plans to clamp the second side to the first and drill thru the pilot holes,then later we are told to clamp the second side to the box,trace inside the driver chamber and horn mouth,remove side,drill holes for fasteners using the traced lines as guides,which way is correct ? I personally like drilling those holes according to the 2nd method.I will be adding pictures to this thread,I can't do it from my phone,image size too big.

Re: At it again,4 more T-48's

Posted: Sat Mar 26, 2016 7:59 am
by jimbo7
I've noticed that, too. I did the 1st method on my last build (AT) since I made 2 access panels. It came out square on the outside, but 1/8" off inside the 2nd panel and chamber. Something must've twisted while glue dried. No big deal but I think either way is fine.

Re: At it again,4 more T-48's

Posted: Sat Mar 26, 2016 10:12 am
by commander_dan
Yeah we also gave up the early drilling out of the 2nd side because the lines were never matching up at the end..

Re: At it again,4 more T-48's

Posted: Sat Mar 26, 2016 11:29 am
by djtrumptight
Cool,I just noticed both methods was mentioned while reading the plans over again although I have built 6 T48's,I drilled the 2nd side pilot holes early on my first 2 and the holes didn't line up right.

Re: At it again,4 more T-48's

Posted: Tue Mar 29, 2016 12:57 am
by djtrumptight
So i got started on the build Saturday,i had a jump start because i had enough BB laying around along with a blown 3015LF so i was able to build the 4 baffles,anchors,rentention blocks and drilled the mounting holes for the drivers.I went to Toledo Ohio and got 10) 4x8 sheets of BB,I had them rip 2 sheets as evenly as possible down the middle and the length for the 8 pieces i would need for 8 sides,i had the other 8 panels ripped into 23" x 8 ft strips.Saturday i made a handle pattern for my router and began.I didnt do anything Sunday and spent ALL DAY today installing panels 1,2,3 and 4,most of the time was spent dry fitting,consulting with Sketchup to make sure i had the correct measurements for the driver chamber and making sure everything was actually square.More to come.
DSCN1021 (200x150).jpg
DSCN1021 (200x150).jpg (52.68 KiB) Viewed 1972 times

Re: At it again,4 more T-48's

Posted: Sun Jul 10, 2016 12:19 pm
by djtrumptight
Re-cap on this project,i finished this build a good while ago,all cabs painted,hardware added,now im just waiting to order a 3015 LF and i have 3 of them boxed up ready to be sent out for reconing.I was hoping to hear all 8 T48's together outside with my 4 DR250's,i have a big picnic to do August 6th,maybe by then i will have them all up and running.

Re: At it again,4 more T-48's

Posted: Sun Jul 10, 2016 10:03 pm
by Tom Smit
:shock:
That'll work!

Re: At it again,4 more T-48's

Posted: Mon Jul 11, 2016 5:56 am
by 88h88
I'll probably be able to hear that from here. :twisted: