Build time for 4 DR250's
Build time for 4 DR250's
Does anyone have an estimate build time to complete 4 Dr 250's, I understand that it depends on the tools you have and the level experience you have. I have a table saw and most power tools available. and my wood working skills are good. I also know that the use of jigs could also help. I've only have 2 t-48's and 1 t39 under my belt so far as BFM designs go.
I had planned on getting these done months ago but got sent out of town for work. Now that I'm back our band is starting to pick up and i need to get these done. we've been playing some regular outdoor shows and the carvin tops we have been using can't keep up with the 2 t48s.
I had planned on getting these done months ago but got sent out of town for work. Now that I'm back our band is starting to pick up and i need to get these done. we've been playing some regular outdoor shows and the carvin tops we have been using can't keep up with the 2 t48s.
T39 / OT12 Bass rig
2 T-48
4 DR250, 6 T-48 in the works
2 T-48
4 DR250, 6 T-48 in the works
-
- Posts: 176
- Joined: Wed Nov 03, 2010 5:15 am
- Location: Lincs UK
Re: Build time for 4 DR250's
Hi I would say you could build 4 in about 40 hours but it depends on what finish you want.
built 4 T30 24in BP102 now sold 2 DR280
2 speakerplans 1850, 2 MT102 ,2 X15, 1 G sub now sold
2 T60,s Built plus 4 DR280,s in the build
2 speakerplans 1850, 2 MT102 ,2 X15, 1 G sub now sold
2 T60,s Built plus 4 DR280,s in the build
- LelandCrooks
- Posts: 7242
- Joined: Thu May 04, 2006 9:36 am
- Location: Midwest/Kansas/Speaker Nirvana
- Contact:
Re: Build time for 4 DR250's
Uh no. Unless you're completely jigged up and have some experience.lincsoldbird wrote:Hi I would say you could build 4 in about 40 hours but it depends on what finish you want.
I've done lots of DR's. And have the jigs. I figure 16-20hrs start to finish. That's finished, done nothing left to do. Maybe the new ones are faster, but I doubt it.
If it's too loud, you're even older than me! Like me.
http://www.speakerhardware.com
http://www.speakerhardware.com
Re: Build time for 4 DR250's
The DR's are very intimidating to me...but I've only built six easy boxes.
Donny Collins
Built:
Two 18" Tuba 30's 3012 LF
Two 26" Tuba 30's Lab 12
Two OmniTop 12's DL 2512 (Melded Array)
Presonus Studio One DAW
Harrison Consoles MixBus 32C DAW
Built:
Two 18" Tuba 30's 3012 LF
Two 26" Tuba 30's Lab 12
Two OmniTop 12's DL 2512 (Melded Array)
Presonus Studio One DAW
Harrison Consoles MixBus 32C DAW
-
- Posts: 931
- Joined: Sun Jul 18, 2010 11:46 pm
- Location: Minneapolis, MN
Re: Build time for 4 DR250's
I can only recall seeing your PVC pipe cutting jig, and I know you would have jigs for cutting piezos. Which other jigs would you use for a DR?LelandCrooks wrote:Uh no. Unless you're completely jigged up and have some experience.lincsoldbird wrote:Hi I would say you could build 4 in about 40 hours but it depends on what finish you want.
I've done lots of DR's. And have the jigs. I figure 16-20hrs start to finish. That's finished, done nothing left to do. Maybe the new ones are faster, but I doubt it.
- LelandCrooks
- Posts: 7242
- Joined: Thu May 04, 2006 9:36 am
- Location: Midwest/Kansas/Speaker Nirvana
- Contact:
Re: Build time for 4 DR250's
Assembly jigs for the horn throats and baffle throat assembly. Plus I built them a little differently than the actual plans. It was a quicker method that burned a lot of plywood. All pretty much invalidated now by the new design.
If it's too loud, you're even older than me! Like me.
http://www.speakerhardware.com
http://www.speakerhardware.com
- Drey Chennells
- Posts: 1377
- Joined: Sun May 17, 2009 10:12 pm
- Location: Central FL ~Authorized Builder
- Contact:
Re: Build time for 4 DR250's
keep in mind Leland's understating a bit

LelandCrooks wrote:[I've done lots of DR's. And have the jigs.
"Things happen, but music stays in your blood forever~." bf
InfraCoustik
Consulting/Design/Fabrication
Authorized BF Builder
http://www.infracoustik.com/
info@infracoustik.com
InfraCoustik
Consulting/Design/Fabrication
Authorized BF Builder
http://www.infracoustik.com/
info@infracoustik.com
-
- Posts: 176
- Joined: Wed Nov 03, 2010 5:15 am
- Location: Lincs UK
Re: Build time for 4 DR250's
Sorry I did only mean the woodwork bit and I do have a well stocked shop. Handles, corners, painting, etc just runs away with time.
built 4 T30 24in BP102 now sold 2 DR280
2 speakerplans 1850, 2 MT102 ,2 X15, 1 G sub now sold
2 T60,s Built plus 4 DR280,s in the build
2 speakerplans 1850, 2 MT102 ,2 X15, 1 G sub now sold
2 T60,s Built plus 4 DR280,s in the build
-
- Posts: 931
- Joined: Sun Jul 18, 2010 11:46 pm
- Location: Minneapolis, MN
Re: Build time for 4 DR250's
I do like the new design. Looks easier for a newb like me.LelandCrooks wrote:Assembly jigs for the horn throats and baffle throat assembly. Plus I built them a little differently than the actual plans. It was a quicker method that burned a lot of plywood. All pretty much invalidated now by the new design.
Re: Build time for 4 DR250's
4 x DR200 took me around 120 hours. That's everything from the first trip to the store for wood all the way to a cab ready to stick on a pole at a gig. It includes jig construction time.
YMMV depending on the level of fit and finish you want. I'm a bit picky about sanding, filling, painting, etc.